A new fully accessible building replaced the former inaccessible cultural center. In addition to the building, the project addressed sidewalks to the building, and in collaboration with the Accessible University Advisory Committee, rebuilt street crossings in immediate vicinity of the building.

Alumni Center 26th Crossing Before/After

Alumni Center 26th Crossing Before/After

26th and Stadium Ave Before/After

26th and Stadium Ave Before/After

CCCC 26th Sidewalks Before/After

CCCC 26th Sidewalks Before/After