2014 Centro Cultural César Chávez and Crossings

A new fully accessible building replaced the former inaccessible cultural center. In addition to the building, the project addressed sidewalks to the building, and in collaboration with the Accessible University Advisory Committee, rebuilt street crossings in immediate vicinity of the building.

Image

Alumni Center 26th Crossing Before/After

Image

26th and Stadium Ave Before/After

Image

CCCC 26th Sidewalks Before/After