Improvements around Gill Coliseum have been designed, and will be constructed in phases. This first phase included rebuilding all sidewalks on the south side of the coliseum and the ADA parking along Ralph Miller Lane. In collaboration with the Accessible University Advisory Committee, the 26th Street crossing from the Beaverstore to Ralph Miller Lane was also reconstructed.