2014 Washington Way Rebuild

Washington Way will be reconstructed in phases, starting with the first phase that was completed in summer 2014. The project will provide a fully accessible redesigned street, sidewalks, and railroad crossings along the entire campus from 35th to 10th. The first phase improved the Washington Way and 15th intersection, with improved sidewalks and street crossings on 15th from Western to Jefferson, and on Washington Way from the intersection to Benton Place.

Image

15th and Wash Way Before/During

Image

15th and Wash Way Before/After Map

Image

15th and Wash Way East Side Before/After

Image

15th Meter Parking and Sidewalk Before/After

Image

15th at Kerr Admin Bldg Mid-Crossing After

Image

Wash Way at Benton Place Before/After

Image

15th East Sidewalk Looking North Before/After

Image

15th and Washington Crossing South

Image

15th and Washington Crossing North